|
|
|
Steel
from the
World
Trade
Center was melted
down in a foundry in
Amite , LA to
cast the ship's bow section. When it was poured
into the molds on Sept 9, 2003, 'those big rough
steelworkers treated it with total reverence, |
|
| likes: 1 | comments: 1 | rips: 0 | rating: 10.42 (19 votes) |
|
|
| Uploaded: | March 19 2009 |
| |
| |
|
|
|
|
Copyright © 2024 Social Concepts, Inc. All Rights Reserved. Patent Pending.
photo.php' rendered in 0.0376 seconds on machine '175'.