|
|
|
First base Cabinets are installed. Ran into a few floor issues, new subfloor is needed. The rest of the 3/4" plywood is being delivered today. |
|
| likes: 1 | comments: 0 | rips: 0 | rating: 11 (2 votes) |
|
|
| Uploaded: | May 01 2022 |
![](/imgs/vi_photoFlag.gif) | |
|
|
|
|
|
Copyright © 2024 Social Concepts, Inc. All Rights Reserved. Patent Pending.
photo.php' rendered in 0.0511 seconds on machine '6'.